We developed some renovation works in the area of the piers in Puerto Banús.
• We performed sanitation works on the entire area to counteract the deterioration of the existing surface. • A layer of Sika Top 412S primer was applied to facilitate the adherence of the new material. • We used the Monotop 442 Multiflow mortar as the new pavement for the pier. • We finished the job using a layer of non-slip paint to prevent falls with the wet floor.